|
Step 1 Note the daily volume of gas to be dehydrated and the temperature and pressure it is entering the contractor.
|
|
Step 2 Note the allowable water per mmscf of gas and the contractor design circulation rate.
|
|
Step 3 (Optional) Optionally note the pump model.
| Pump model  |
|
|
|
Step 4 Press Calculate to perform the calculation.
|
|
Calculated Results
|