Step 1Note the daily volume of gas to be dehydrated and the temperature and pressure it is entering the contractor.
Step 2Note the allowable water per mmscf of gas and the contactor design circulation rate.
Step 3 (Optional)Optionally note the pump model.
Step 4Press Calculate to perform the calculation.
Calculated Results